Wird verarbeitet…
OSM

Cargo Tank Heating

medium 3 / 3 Modelle (Inspector)
Cargo tank heating coils and systems for heated cargoes
Inspector Mode Show All 3 / 3 with inspector value

2 Hersteller · 3 Modelle

🏭

Alfa Laval

2 ✓ 2 verifiziert
Aalborg (Alfa Laval) Aalborg Thermal Oil Heater Marine
Aalborg Thermal Oil Heater Marine ✓ verifiziert Inspector
variable · Cargo Hold Equipment · thermal_oil_heater
type: thermal_oil_heater
Common Failures:
  • • Thermal oil degradation
  • • Burner failure
  • • Pump seal leak
  • • Control system failure
Service: Thermal oil systems for high-temp cargoes. Oil analysis annually.
Spares: Aalborg (Alfa Laval): Ersatzteile per Hersteller. Lead time: 3-8 Wochen. Dichtungen und Ventileinsätze an Bord vorhalten.
Alfa Laval Alfa Laval Cargo Heating Coil
Alfa Laval Cargo Heating Coil ✓ verifiziert Inspector
variable — per tank size · steam · heating_coil
type: heating_coil
medium: steam
Common Failures:
  • • Coil tube perforation/leak
  • • Steam trap failure
  • • Condensate return blockage
  • • Coil support bracket failure
Service: Pressure test coils annually. Replace perforated sections. Steam trap maintenance.
Spares: Alfa Laval: Ersatzteile per Hersteller. Lead time: 3-8 Wochen. Dichtungen und Ventileinsätze an Bord vorhalten.
🏭

Kangrim Heavy Industries

1 ✓ 1 verifiziert
⚙️
Kangrim Thermal Fluid Heater ✓ verifiziert Inspector
variable · Cargo Hold Equipment · thermal_oil_heater
type: thermal_oil_heater
origin: Korea
Common Failures:
  • • Coil tube perforation
  • • Burner malfunction
  • • Thermal oil carbonization
Service: Korean manufacturer. Common on Korean-built tankers.
Spares: Kangrim Heavy Industries: Ersatzteile per Hersteller. Lead time: 3-8 Wochen. Dichtungen und Ventileinsätze an Bord vorhalten.