OS
← Tanker Cargo Systems

Loading Computer

high IMO Required
Class-approved loading instrument for stability and strength calculations.
8760h
Service Interval

Typical Manufacturers

Aveva DNV

Known Models (2)

Aveva Aveva NAPA Loading Computer
Aveva Aveva NAPA Loading Computer
Per Hersteller-Datenblatt · Marine Equipment · Loading Computer Software
Common Failures:
  • • Software licence expiry
  • • Draft sensor calibration drift
  • • Database corruption after power loss
Service: Annual class approval update. Backup database monthly. UPS recommended.
Spares: Aveva: Ersatzteile per Hersteller. Lead time: 3-8 Wochen. Dichtungen und Ventileinsätze an Bord vorhalten.
✔ Pros
  • • Enhanced cargo operation efficiency
  • • Improved safety through real-time stability and stress calculations
  • • Optimized cargo loading and unloading processes
  • • Compliance with regulatory requirements through accurate calculations and documentation
  • • User-friendly interface for ease of operation
⚠ Cons
  • • Software licence expiry can cause operational downtime
  • • Draft sensor calibration drift may lead to inaccurate calculations
  • • Database corruption after power loss can result in data loss and operational delays
Typical Vessels: TankerChemical TankerLNG TankerCrude Oil Tanker
Certifications: IMODNV
Decision Guide: Choose if you need a reliable and efficient loading computer for tanker cargo operations that can optimize cargo handling and ensure compliance with regulatory requirements. Avoid if you are looking for a system with inherent redundancy against software licence expiry or if your operations frequently experience power losses.
Use Cases: This equipment is typically deployed on tankers for cargo loading and unloading operations, ensuring safe and efficient transfer of cargo while maintaining vessel stability and compliance with international maritime regulations.
DNV DNV ShipManager Loading Computer
DNV DNV ShipManager Loading Computer
Per Hersteller-Datenblatt · Marine Equipment
Common Failures:
  • • Outdated hydrostatic data
  • • Interface error with draft sensors
  • • Operating system incompatibility after update
Service: Update hydrostatic data after any structural modification. Class renewal every 5 years.
Spares: DNV: Ersatzteile per Hersteller. Lead time: 3-8 Wochen. Dichtungen und Ventileinsätze an Bord vorhalten.