OS
← Anchor & Mooring

Capstan

medium
Vertical-axis rotating machine for warping and line handling.
4000h
Service Interval

Typical Manufacturers

Plimsoll MacGregor

Known Models (8)

Coastal Marine Equipment (China) CME Capstan
Coastal Marine Equipment (China) CME Capstan
Pull 10-60 kN · Mooring Lines
type: Vertical Capstan
size_range: ['CME-CAP-10', 'CME-CAP-20', 'CME-CAP-40', 'CME-CAP-60']
power_range_kw: [3, 30]
variant_count_approx: 4
period_start_year: 2005
period_end_year: None
drive_type: Electric
construction: Cast steel, worm gear
Common Failures:
  • • Worm gear quality varies
  • • Motor insulation issues in humid climates
  • • Drum casting quality inconsistent
Service: Kürzere Inspektions-Intervalle empfohlen als bei europäischen OEMs.
Spares: CME China. Lead time: 2-3 weeks China.
Hatlapa / MAN Energy Solutions (Germany) Capstan Type CV
Hatlapa / MAN Energy Solutions (Germany) Capstan Type CV
Pull 20-80 kN · Mooring Lines
type: Vertical Capstan
size_range: ['CV-20', 'CV-40', 'CV-60', 'CV-80']
power_range_kw: [5, 40]
variant_count_approx: 4
period_start_year: 1965
period_end_year: None
drive_type: Electric / Hydraulic
construction: Cast steel, vertical drum, worm gear
Common Failures:
  • • Worm gear wear
  • • Motor bearing failure from deck exposure
  • • Drum surface wear
Service: Standard capstan maintenance. Worm gear oil annually.
Spares: MAN PrimeServ. Lead time: 3-6 weeks.
Kawasaki Heavy Industries (Japan) KCP Capstan Series
Kawasaki Heavy Industries (Japan) KCP Capstan Series
Pull 20-80 kN · Mooring Lines
type: Vertical Capstan
size_range: ['KCP-20', 'KCP-40', 'KCP-60']
power_range_kw: [5, 35]
variant_count_approx: 3
period_start_year: 1975
period_end_year: None
drive_type: Electric
construction: Cast steel, vertical drum, worm gear
Common Failures:
  • • Worm gear wear
  • • Motor insulation degradation
  • • Drum surface wear
Service: Standard capstan maintenance.
Spares: KHI Japan. Lead time: 3-5 weeks Asia.
MacGregor MC-E Electric Capstan
MacGregor MC-E Electric Capstan
80 kN pull · Anchor Chain / Mooring Lines
Common Failures:
  • • Slip ring corrosion
  • • Thermal overload trips
  • • Cable gland ingress
Service: Keep motor ventilation openings clear. Inspect slip rings annually.
Spares: MacGregor: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.
MacGregor / Cargotec (Finland) Pusnes Capstan Range
MacGregor / Cargotec (Finland) Pusnes Capstan Range
Pull 20-100 kN · Mooring Lines
type: Vertical Capstan (Warping)
size_range: ['CAP-20', 'CAP-40', 'CAP-60', 'CAP-100']
power_range_kw: [5, 50]
variant_count_approx: 4
period_start_year: 1970
period_end_year: None
drive_type: Electric / Hydraulic
construction: Cast steel, vertical drum, worm gear drive
Common Failures:
  • • Worm gear wear after 15,000-20,000 hrs
  • • Motor overheating from extended use beyond duty cycle
  • • Drum surface wear from rope friction
  • • Foundation bolt loosening from vibration
Service: Worm gear oil change annually. Motor insulation test annually. Drum surface check at drydock. Duty cycle: typically 30 min on / 30 min off.
Spares: MacGregor/Cargotec. Lead time: 3-6 weeks.
Plimsoll PC-Series Capstan
Plimsoll PC-Series Capstan
50 kN pull · Anchor Chain / Mooring Lines
Common Failures:
  • • Warping head bearing wear
  • • Motor brush wear (DC types)
  • • Foundation bolt loosening
Service: Grease warping head bearing monthly. Check foundation bolts quarterly.
Spares: Plimsoll: Bremsbeläge an Bord vorhalten. Lead time: 3-6 Wochen.
Rolls-Royce / Kongsberg Maritime (UK/Norway) Capstan Range
Rolls-Royce / Kongsberg Maritime (UK/Norway) Capstan Range
Pull 20-100 kN · Mooring Lines
type: Vertical Capstan
size_range: ['RR-CAP-20', 'RR-CAP-50', 'RR-CAP-100']
power_range_kw: [5, 50]
variant_count_approx: 3
period_start_year: 1990
period_end_year: None
drive_type: Electric / Hydraulic
construction: Cast steel, worm gear, weather-protected motor
Common Failures:
  • • Worm gear wear
  • • Motor overheating
  • • Drum surface wear
Service: Standard capstan maintenance.
Spares: Kongsberg Maritime. Lead time: 3-6 weeks.
Towimor (Poland) Capstan Series
Towimor (Poland) Capstan Series
Pull 10-60 kN · Mooring Lines
type: Vertical Capstan
size_range: ['TW-CAP-10', 'TW-CAP-20', 'TW-CAP-40', 'TW-CAP-60']
power_range_kw: [3, 30]
variant_count_approx: 4
period_start_year: 1960
period_end_year: None
drive_type: Electric / Hydraulic
construction: Cast steel, worm gear
Common Failures:
  • • Worm gear wear
  • • Motor moisture ingress
  • • Drum surface deterioration
Service: Standard capstan maintenance.
Spares: Towimor Torun. Lead time: 2-4 weeks Europe.