Stern Tube Seal
medium
Propeller shaft stern tube sealing systems
Known Models (4)
Blohm+Voss (Aegir) Marine Stern Tube Seal
Shaft diameter 150-800mm
· Propulsion Shaft Line
· Lip Seal Stern Tube
type: Lip Seal Stern Tube
Common Failures:
- • Seal lip wear
- • Air seal pressure fluctuation
- • Liner surface damage
- • Aft seal oil contamination with seawater
Service: Multiple seal arrangement (typically 3-4 seals). Monitor aft seal oil condition for seawater ingress. Drydock seal replacement.
Spares: Blohm+Voss (Aegir): Dichtungs-Elemente und Verschleißmesswerkzeuge an Bord vorhalten. Lead time: 4-8 Wochen.
Duramax Marine ROMOR Water-Lubricated Bearing
Shaft diameter 75-1000mm
· Propulsion Shaft Line
· Water-Lubricated Stern Tube Bearing
type: Water-Lubricated Stern Tube Bearing
Common Failures:
- • Bearing surface wear
- • Shaft sleeve corrosion
- • Debris ingestion damage
Service: EPA VGP compliant (no oil). Composite material — excellent shock resistance. Monitor clearances via poker gauge.
Spares: Duramax Marine: Dichtungs-Elemente und Verschleißmesswerkzeuge an Bord vorhalten. Lead time: 4-8 Wochen.
Thordon Bearings SXL Water-Lubricated Bearing
Shaft diameter 100-900mm
· Propulsion Shaft Line
· Water-Lubricated Stern Tube Bearing
type: Water-Lubricated Stern Tube Bearing
Common Failures:
- • Bearing stave wear
- • Shaft sleeve erosion from sediment
- • Water flow restriction
- • Alignment issues
Service: Seawater-lubricated — zero pollution risk (EPA VGP compliant). Monitor bearing clearances. Replace staves when clearance exceeds limit.
Spares: Thordon Bearings: Dichtungs-Elemente und Verschleißmesswerkzeuge an Bord vorhalten. Lead time: 4-8 Wochen.
Wärtsilä (Cedervall) Simplex Compact Seal
Shaft diameter 200-1000mm
· Propulsion Shaft Line
· Lip Seal Stern Tube
type: Lip Seal Stern Tube
Common Failures:
- • Lip seal wear causing oil leakage
- • Chromium liner scoring
- • Air seal chamber pressure loss
- • Spring tension loss
Service: Monitor stern tube oil consumption for seal wear. Replace seals at drydock. Check chromium liner for scoring. MARPOL — zero discharge target.
Spares: Wärtsilä (Cedervall): Dichtungs-Elemente und Verschleißmesswerkzeuge an Bord vorhalten. Lead time: 4-8 Wochen.