← Shaft Line & Propulsion

Shaft Generator / PTO

medium
Power take-off generator driven by main engine shaft
8000h
Service Interval
25 yr
Typical Lifetime

Typical Manufacturers

ABB Siemens Hyundai

Known Models (3)

ABB AMG 1600
ABB AMG 1600
1600 kW · 1600.0 kW · Electrical (440V/60Hz)
Common Failures:
  • • Bearing failure
  • • Winding insulation breakdown
  • • Frequency converter fault
  • • Coupling vibration
Service: Shaft generator with frequency converter; monitor insulation resistance.
Spares: ABB: Dichtungs-Elemente und Verschleißmesswerkzeuge an Bord vorhalten. Lead time: 4-8 Wochen.
Hyundai HFC7 Series
Hyundai HFC7 Series
800 kW · 800.0 kW · Electrical (440V/60Hz)
Common Failures:
  • • Bearing temperature alarm
  • • Insulation resistance low
  • • Voltage regulator fault
Service: Korean-built shaft generator; common on Hyundai-built vessels.
Spares: Hyundai: Dichtungs-Elemente und Verschleißmesswerkzeuge an Bord vorhalten. Lead time: 4-8 Wochen.
Siemens 1FJ6 Series
Siemens 1FJ6 Series
1200 kW · 1200.0 kW · Electrical (440V/60Hz)
Common Failures:
  • • Stator winding overheating
  • • Bearing wear
  • • AVR malfunction
  • • Brush wear (if slip-ring)
Service: Siemens shaft generator; IR test annually; check AVR settings.
Spares: Siemens: Dichtungs-Elemente und Verschleißmesswerkzeuge an Bord vorhalten. Lead time: 4-8 Wochen.